Skip to main content
Loading…
This section is included in your selections.

8-402.A. Permit Authority Responsible. Where interpretation is needed as to the exact location of the boundary of any designated area and where there appears to be a conflict between a mapped boundary and actual field conditions, the Permit Authority shall make the necessary determination of the boundary.

8-402.A.1. The Permit Authority shall make interpretations, where needed, as to the exact location of the boundaries of the areas of special flood hazards (for example, where there appears to be a conflict between a mapped boundary and actual field conditions).

8-402.A.2. Any person contesting the location of the boundary shall be given an opportunity to appeal the location to the Permit Authority. The appeal shall include detailed studies appropriate to Telluride’s unique geologic or hydraulic environment, prepared by a qualified engineering geologist or professional engineer.

8-402.B. Appeal. Determinations of the Permit Authority as to boundary disputes may be appealed to the Town Council, pursuant to Section 8-410 of this Division.