Skip to main content
Loading…
This section is included in your selections.

A. The Transitional Hillside Treatment Area poses special technical problems for most projects, including rockfall, soil erosion and drainage control. Development in this area should incorporate designs that mitigate these conditions, and should, if required, undergo environmental and engineering review for safety concerns

Refer to the Land Use Code and Telluride Hillside Master Plan for additional information and requirements.