Skip to main content
Loading…
This section is included in your selections.

(a) Whenever work which requires a building permit is being performed on any premises, the owner of the premises and the person performing the work shall remove from the Town, within seven (7) days, all refuse which is produced. Within seven (7) days after the completion of the work, the owner of the premises and the person who performed the work shall remove from the Town all refuse on the premises. Refuse, as used in this Section, shall also include all plaster, cement or concrete, bricks, cinder blocks, stones, wood, roofing material, wire and metal binding, sacks or any other construction material which will no longer be used in the construction work. Excess or used construction refuse that may be considered recoverable resources for another project in another location should be moved to the alternate location within seven (7) days after completion of the work.

(b) All construction sites must have a designated container that receives refuse attractive to wildlife. This container shall either be a wildlife-resistant container, or contained within a wildlife-resistant enclosure. (Prior code 7.08.020; Ord. 1351, 2011)